Marktbericht 

 

The following information has been gathered from multiple sources and qualified by Future Electronics Product Marketing. The information is intended to provide guidance only and should be treated accordingly.

Future Electronics offers world-class supply chain programs to mitigate market supply and demand volatility. Contact your Account Manager to discuss our solutions in more detail.

Please click here to download a PDF Version.

ANALOG
TechnologyManufacturerPricing Trend compared to previous QuarterCurrent
Lead-Times
Lead-Times
Trend
Comments
Alternating Current/ Direct Currect & Direct Current / Direct Current Converters IntersilStable8-10Stable 
STMicroelectronicsStable8-10StableAutomotive VNX series 24+ week lead time
Diodes IncStable8-10Stable
MicrochipStable8-10Stable
ON SemiconductorStable8-10Stable
Monolithic Power SystemsStable8-10Stable
Diodes IncStable8-10Stable
Rohm
Semiconductor
Stable8-10Stable
InfineonStable8-10Stable
SensorsSTMicroelectronicsIncreasing14-24IncreasingMEMS sensors stretching to 24 weeks
Temperature sensors remain stable at 14-16 weeks
Diodes IncStable8-10Stable
Kionix/RohmStable14-16Stable
PanasonicStable 12-14StableIncludes PIR motion sensors (EKMB, EKMC series), GridEye (AMG88** series) and pressure (ADP*)
ON SemiconductorStable16-24Stableincludes image sensors (Aptina, Python, Trusense) and temp sensors
amsStable12-24StableVaries by product: TAOS products (TSL, TMD, TCS) 16 weeks / Cambridge CMOS (CCS801, CCS811) 12-14 weeks / CMOSIS image sensors 16-24 weeks depending on the part series / Position, Temperature, IAQ 16-18 weeks / Smart Lighting Manager (AS72xx) 12-14 weeks
AmphenolStable12-14Stable
BoschStable12-14StableFactory lead time TO BUILD product (Bosch Germany) is 12 weeks. This does not include transit time when parts are shipped from Germany to North America
MurataStable18-20Stable
NXP
(Freescale)
Stable18-20StableSpecific to accelerometers and pressure sensors
InfineonStable16-24Stable
Rohm SemiconductorStable12-20StableKionix intertial sensors (Acceleromoters and IMU's) are a great alternative in accounts where ST / Bosch are already designed in with another distributor
TE SensorsIncreasing8-14StableVaries by product: 6-8 wks on certain temp, pressure, vibration sensors / 8-10 wks on certain force, humidity, pressure, temp sensors / 10-12 weeks on certain temp, position, pressure sensors / 12-14 on certain pressure and temp sensors.
MelexisStable16-30StableVaries by product: Optical/FIR temp sensors: 16-24 weeks / Latch&Switches 16-22 weeks / Position sensors 16-30 weeks / Pressure sensors 16-26 weeks / Hardware& Tools 3-5 weeks
VishayStable10-14StableDigital sensor portfolio (VCNL, VEML prefix) running between 14 - 18 weeks
InterfaceExarStable8-10Stable
NXPStable10-12Stable 
FDTIIncreasing20IncreasingFTDI has increased pricing, as well as moved all order processing to Asia. They are requesting detail information on every release. As a result of these actions, this has delayed order processing
Mixed Signal Amplifiers and ComparatorsIntersilStable8-10Stable
MicrochipStable8-10Stable
ExarStable8-10Stable
ON SemiconductorStable12-20+StableIncreased lead times overall, some families 20+
STMicroelectronicsStable8-10Stable
Clocks/TimingMicrochipStable8-10Stable
MicrosemiStable10-12Stable 
IDTStable8-10Stable 
ON SemiconductorStable12-20+StableSome families 20+ weeks
PericomStable8-10StablePericom has been purchased by Diodes Inc. Currently, there are noimminent changes to pricing and lead times
Standard AnalogSTMicroelectronicsStable6-8StableD2Pak lead times 25-35 weeks
Diodes IncStable6-8Stable
ON SemiconductorStable6-8Stable 
FairchildStable6-8Stable 
LogicNXPDecreasing 8-12StableNXP has spun off their logic division. As of Jan 2017, it will be known as Nexperia. NXP has been aggressive in gaining market share on large opps.
Diodes IncDecreasing6-8StableDiodes has aggressive stance on pricing.
ON SemiconductorStable 8-12DecreasingON has taken an aggressive stance on price. Lead times are steady.
FairchildStable 8-10Stable Fairchild has been acquired by On Semi. Currently there is no immediate changes in pricing strategy and lead time. The long term outlook will result in a majority of the Fairchild parts being assimilated into the ON Semi Logic division

Die neusten Nachrichten für Sie....